Bartek Steel Fixing

Reinforcement
on every kind
of frame.

A sample of packages delivered over the last two seasons.
Tonnages and durations are as-built, not as-tendered.

  • Rafts, retaining structures, ground beams and cage runs
  • Water treatment, highways and industrial sites
  • 3packages on the record
  • 109 treinforcement fixed, as built
  • 6weeks on site, as built
  • 1sectors: Industrial

The record

Element, tonnage, programme, sector and region for each package. Client names are withheld until we have sign-off to publish them.

Retaining wall

Retaining wall

Element
Ground beams
Tonnage
17 t
Programme
2 weeks
Sector
Industrial
Location
East of England
Water tank

Water tank

Element
Cages
Tonnage
46 t
Programme
6 days
Sector
Industrial
Location
East of England
Base for retaining wall

Base for retaining wall

Element
Cages
Tonnage
46 t
Programme
3 weeks
Sector
Industrial
Location
East and West Midlands

How we
record a
package

Every package is logged the same way, so a figure on this page is the figure that came off site. Tonnage is what was fixed, not what was scheduled. Programme is weeks on site, start to sign-off.

Tonnage
As-built, off the fixed schedules
Programme
Weeks on site, start to sign-off
Steel
BS 4449, B500B and B500C
Shapes
BS 8666, to your bar schedules
Client names
Published only with sign-off
CIS registered£1m public liability£10m employers’ liabilityRAMS before we start

Need
steel
fixers
on site?

Send the drawings and bar bending schedules.
We come back with a price or a labour rate.