Steel fixing

Reinforcement fixed to the engineer’s drawings and bar bending schedules, from ground beams to full RC frames. Take the gang against your own steel, or hand over the steel as well.

  • CIS registered
  • £1m public liability
  • £10m employers’ liability
  • RAMS issued before we start
  • H12–H32bar sizes we fix
  • BS 8666bar schedules we work to
  • 2ways to engage, labour or supply and fix
  • UK-widewe travel to the job

Right
before
the pour

Steel fixing is the part of the frame you cannot see once the concrete goes in. It has to be right before the pour, or it cannot be corrected afterwards.

Every element is fixed to the engineer’s drawings and bar bending schedules. Bar marks are checked against the schedule as each section goes in. Cover is held on spacers and chairs to the values on the drawing. Laps and starters go where the schedule puts them, not where they happen to fit.

Cages are tied in situ or prefabricated and craned in, whichever suits the access and the programme. The fixing sequence is worked around your formwork and pour dates, so steel is never the reason a pour slips.

If a bar does not work on site, you hear about it while there is still time to fix it, not at the pre-pour inspection.

Engagement
Labour supply or supply and fix
Supervision
Yours on labour supply, ours on supply and fix
Material
Yours, or scheduled and procured by us
Standards
BS 4449 · BS 8666
Coverage
Nationwide UK, based in Greater Manchester

How it runs

Four stages from the drawings landing to the steel being released for the pour.

  1. Stage 01

    Drawings and engagement

    Send the reinforcement drawings, schedules if you have them, the programme and the site location. Tell us whether you want labour against your steel or supply and fix, and we come back with a rate or a package price.

  2. Stage 02

    Check and paperwork

    Drawings and schedules are read against each other before the start, so queries are raised early. RAMS, insurance certificates and CSCS cards are issued before anyone sets foot on site.

  3. Stage 03

    Fix

    Elements are fixed to the drawings and to your setting-out, in the order your pours need them. Bar marks, cover and laps are checked as each section goes in, not at the end.

  4. Stage 04

    Sign-off

    Sections walked with your engineer and snags closed the same day. Steel released for the pour on the programme date.

Wall starters fixed against formwork
Column starters set out and tied, ready for the kicker pour.

Scope and standards

What steel fixing covers on every job, and what stays with other trades. Scheduling, procurement and deliveries are added when you take supply and fix.

In scope
Fixing, Tying, Spacing, Chairs, Starters, Mesh laps, Setting out, Prefabricated cages
Not in scope
Design, Groundworks, Formwork, Concrete
Added with supply and fix
Scheduling, Procurement, Deliveries
Engagement
Labour supply or supply and fix
Elements fixed
Ground beams, columns, cages, slabs, RC frames, mesh
Bar and mesh sizes
H12–H32 bar, A142–A393 fabric and B-series mesh
Reinforcing steel
BS 4449, grades B500B and B500C
Bar shapes and scheduling
BS 8666, to your schedules or scheduled by us
Documentation
RAMS issued before start; insurance certificates and cards submitted with the package
Insurance
£1m public liability · £10m employers’ liability
Tax status
CIS registered

Cover, lap and centre values are design values from the engineer’s drawings and are not published here. Rates and package prices are quoted per enquiry, from the drawings, the programme and the location.

Choose
how you
take it on

Labour supply: our gangs on day or week rates, fixing against steel you have already procured. Supply and fix: we schedule, procure, deliver and fix. One order, one invoice, one company accountable at the pre-pour inspection.

CIS registered£1m public liability£10m employers’ liabilityRAMS issued before we start

Need
steel
fixers
on site?

Send the drawings and bar bending schedules.
We come back with a price or a labour rate.